Requests for new service, or the development of areas within Marshall Municipal Utilities' (MMU's) service territory may require the payment of some contribution in aid of construction fees before installation of MMU infrastructure will commence.
Please contact the appropriate party (ies) below to provide the necessary information for new services or infrastructure extensions. ALL requests must be made in writing and signed by the responsible party.
Water and Wastewater | Electricity | |
---|---|---|
Grant Piper, Director Underground Facilities | Doug Root, Director Electric Distribution | |
Mailing address: | 75 East Morgan, Marshall, MO 65340 | 75 East Morgan, Marshall, MO 65340 |
Physical address: | 1455 West Arrow | 1459 West Arrow |
Phone: | 660-886-6966, ext 1400 | 660-886-6966, ext 1300 |
Current fixed fees:
WATER | |
---|---|
Inside City Limits | |
3/4" service | $250.00 |
1" service | $100.00 additional cost |
2" service | Additional cost of material and labor less estimated cost of material and labor for a 3/4" service |
Greater than 2" service | $250.00 plus the additional cost of material provided by MMU. Customer will excavate the main and install the service connection. MMU personnel will tap the main. |
Outside City Limits | All costs plus prior approval by the Board of Public Works (BPW). |
WASTEWATER | |
---|---|
Inside City Limits | |
Water service connection of 1" or less | $250.00 |
Water service connection of 1" to 3" | $500.00 |
Water service connection of 4" or greater | $1,000.00 |
MSDC Area | Additional $500.00 |
Outside City Limits | Fee based on size of service plus prior approval by the Board of Public Works (BPW). |
Some areas in Marshall are subject to additional charges for sewer infrastructure. The MSDC Sewer (an area generally described as west of Miami Street and north of the Gateway Railroad) is subject to an additional fee of $500.00 per sewer tap. (Excludes lots within the MSDC Industrial Park) The South Odell Sewer (an area generally described as East of the airport runway and south of Sunset Cemetery and the Elsea III Addition) is charged an annual tax by an NID for twenty years.
ELECTRIC | |
---|---|
Single-phase service | $250.00 per meter |
Three-phase service | The greater of $250.00 or a fee based on a cost estimate prepared from information provided by the customer and MMU personnel. Fee subject to change if information provided is not accurate. |